discharge level meaning in Chinese
排水水位
Examples
- Based on the unascertainty of river water environmental system , the unascertained mathematics theory was used to research the issue of water environmental carrying capacity , and to assess the risk that corresponds to different discharge levels
摘要从水环境系统的未确知出发,运用未确知数学理论对河流水体纳污能力及其风险问题进行研究。 - Three phase dry type power transformer , which make it with those features : safety , reliability , and energy saving , fireproof , flameproof , simple maintenance etc . , the design is advanced ; the structure of products is reasonable and the outline is fine , the main performances of the products are much better than the national standards , for example , partial discharge level no - load loss , on - load loss , noise level , it is adaptable for application on heavy humidity and severely pollute places which are near to lake , sea and rive , as well as , high demand - fireproof , heavy load capacity place , such as : high building , airport , station , port , underground , hospital , electrical power station , metallurgy , shopping center , residential area and petroleum chemical industry , nuclear power station , nuclear - powered submarine
非包封线圈三相干式变压器,具有安全可靠节能防火防爆维护简单等优点。其设计先进结构合理外形美观。主要性能指标均优于国内标准,如局放水平空载损耗负载损耗噪声以及能适应高温度环境使用等,可安装在靠近湖海河边污秽潮湿的环境及防火要求高负荷较大的地区,适用于高层建筑机场车站码头地铁医院电厂冶金行业购物中心居民密集区以及石油化工核电站核潜艇等场所。 - Windings d . c . resistance measurement , measurement of impedance voltage and on - load loss , measurement of no - load loss and on cload current , power frequency withstand voltage test , inductive voltage with standing test , measurement of partial discharge level , inspection of appearance and dimension inspection of name plate
直流电阻测试匝数比测量及电压矢量关系的校定阻抗电压及负载损耗的测量空载损耗及空载电流的测量工频耐压测试感应耐压测试绝缘电阻测试局部放电测试外观和尺寸的检验铭牌的检验等。 - Abstract : based on the results of hydraulic model test and remote - control ship model , the unsteady flow characteristics in the downstream approach channel and the reaches from three gorges project to gezhouba project and navigation conditions in these reaches during the tgp flood - discharge are analyzed . the measures of raising navigation discharge level and improving navigation conditions are given
文摘:根据水工模型试验成果,分析了三峡工程泄洪时坝下游引航道和两坝间河段(三峡至葛洲坝)的非恒定波流运动特性,结合遥控自航船模试验对两坝间的通航水流条件进行了分析评价,并提出了提高通航流量标准、改善通航条件的相应措施。